Utility Room Renovation

Click on first photo for slideshow
  1. Managing Director
    Original Condition
    Condition of the room prior to teardown.
  2. Managing Director
    Teardown Work
    Subfloor was extremely damaged and required removal.
  3. Managing Director
    Rough Repairs
    After removing subfloor, severe damage to structural members discovered.
  4. Managing Director
    Subfloor Condition
    Rotting wood discovered.
  5. Managing Director
    Prior Repairs
    Prior unlicensed contractor attempted structural repair using a 2x4 and galvanized brackets.
  6. Managing Director
    Floor Joists
    Floor joists were so badly rotted, they were splitting, causing damage to HVAC system.
  7. Managing Director
    Joist Repairs
    New joist beams were installed using stainless fasteners.
  8. Managing Director
    Additional Repairs
    New floor joists were added to rebuild structural integrity of floor.
  9. Managing Director
    Repairs
    Photo of joists going all the way to the central flooring beam.
  10. Managing Director
    Overview of Repairs
    Floor joists installed to straighten flooring.
  11. Managing Director
    Ductwork repaired
    The HVAC ductwork was re-elevated, reconnected, and re-sealed.
  12. Managing Director
    Subfloor added
    A new subfloor was added overtop the structural repairs.
  13. Managing Director
    Final Look
    Final look after all new subflooring, drywall, paint, and new flooring.