Complete Bathroom Remodel

Click on first photo for slideshow
  1. Managing Director
    Final Look.
    New water resistant flooring, along with a vanity, toilet, lights, mirror, and a paint job.
  2. Managing Director
    Rebuild Stage.
    Structural lumber replaced and water resistant Greenboard added around tub.
  3. Managing Director
    After teardown.
    Structural lumber in the exterior wall was rotted due to water damage and required replacing.
  4. Managing Director
    Original Bathroom.
    Bathroom prior to teardown. Bathtub exterior wall was leaking and there were three floors installed on top of each other.